How to Disassemble and Maintain a Plate-and-Frame Filter Press Feed Pump

Nov 21, 2026 Leave a message

Dr. Emily Carter
Dr. Emily Carter
As a leading technical expert at Hansheng Automation, Dr. Carter specializes in the R&D of next-generation intelligent electric actuators and control solutions. Her work focuses on integrating cutting-edge technology to enhance the performance and reliability of our gear reducers.

 

The disassembly and maintenance of a plate-and-frame filter press feed pump require attention to component condition, assembly sequence, and installation clearances. Proper maintenance helps prevent premature wear and reduces the risk of pump failure.

The following procedures describe a pump with a separate motor, coupling, pump head, rotor assembly, and bearing housing. The actual structure and assembly requirements may vary by pump model. Always check the manufacturer's service manual before carrying out maintenance or replacing components.

Routine Maintenance and Inspection

Inspect Components and Replace Worn Parts

Regularly inspect the pump casing, motor, and connecting components. Pay particular attention to wear-prone parts, including seal rings, the impeller, and bearings. Replace components that show excessive wear, damage, or deterioration.

When the pump will remain out of service for an extended period, clean and flush the internal flow passages to remove residual slurry and prevent corrosive media from damaging internal components. Disconnect and isolate the electrical supply to prevent accidental startup during maintenance.

Do not operate the pump without liquid. Dry running can cause excessive vibration and overheating, damage sealing components, and shorten the pump's service life.

Lubrication Management

Replace the lubricant in the bearing housing at the intervals specified by the pump manufacturer. Use the recommended lubricant grade and keep replacement oil in clean, sealed containers.

During maintenance, drain the existing oil into a suitable container. Reuse it only when its condition meets the manufacturer's requirements. Replace contaminated or degraded oil before restarting the pump.

Before assembly, apply a thin film of compatible lubricant to the specified mating and fitting surfaces. This helps prevent galling and damage to shaft and bearing fitting surfaces during installation.

Pump Disassembly Procedure

Preparation Before Disassembly

Before starting work, disconnect and isolate the electrical supply, following the applicable lockout and tagout procedures. Isolate the pump from the connected pipelines, release any remaining pressure, and drain the liquid from the pump casing.

Drain the lubricant from the rotor bearing housing into a clean container for inspection and proper handling.

Mark the positions and assembly orientations of important components, including the impeller, bearings, and pump casing. Keep removed parts, shims, and sealing components organized to prevent incorrect installation or damage to mating surfaces.

For corroded fasteners, apply a suitable penetrating lubricant and allow it to work before removal. A wooden or soft-faced mallet can be used to loosen stubborn components, but avoid striking machined surfaces directly.

Separating the Motor and Pump

First, remove the coupling guard and disconnect the motor from the coupling. Remove the motor from its mounting position.

Keep the coupling components and connecting fasteners together for inspection and reassembly. Check the coupling for visible wear or damage before proceeding.

Removing the Pump Head

Disassemble the pump head in sequence. Depending on the pump design, this involves removing the pump casing sections, impeller, and liner or guard plates.

If the fault is limited to the front section of the pump head, the rotor assembly and bearing housing generally do not need to be dismantled. This avoids unnecessary work on components that are not affected.

Dismantling the Rotor Assembly

After removing the pump head components, proceed with the rotor assembly, bearing housing, and bearings.

Inspect the shaft, bearing seats, threaded connections, and mating surfaces for wear, deformation, or damage. Replace any damaged gaskets and sealing components.

Clean the dismantled parts with a cleaning agent compatible with the component materials. Make sure the parts are free of residual slurry, oil deposits, and other contaminants before assembly.

Pump Assembly and Critical Clearances

Assembling the Rotor and Bearing Housing

For the cylindrical bearing housing design covered by this procedure, install the front bearing first, fit the bearing housing, and then install the rear bearing.

Fit the oil seals into the front and rear bearing covers using suitable, compatible asbestos-free gasket materials. For this pump design, the original assembly specification gives a clearance of 0.05-1.50 mm between the rear bearing cover and the bearing. Confirm the applicable value against the drawing or service manual for the specific pump model.

After securing the rotor assembly in the support frame, use a magnetic-base dial indicator to check the alignment.

Measure the concentricity and perpendicularity of the locating bore and mating face between the support frame and rear pump casing relative to the shaft's rotational axis. Both measurements should not exceed 0.25 mm.

Assembling the Pump Head

Position the rear pump casing on the semi-circular locating face at one end of the support frame. For pump designs with this construction, the rear casing generally does not need to be removed during routine major maintenance unless inspection requires it.

Apply suitable grease to the T-shaped thread of the impeller before installing it on the shaft. Tighten the impeller and make sure the secondary impeller or first-stage impeller, as applicable, is properly seated.

Tighten the connecting bolts between the front and rear pump casings evenly to ensure proper seating.

The clearance between the impeller and the front casing wall or liner plate should be maintained within 0.75-1.50 mm for the referenced pump design. Check and adjust this clearance according to the manufacturer's specifications.

Final Inspection and Test Run

Before starting the pump, check all fasteners and make sure the required lubrication points have been properly serviced.

Turn the shaft manually to confirm that the impeller rotates freely without rubbing against the pump casing or liner plates. Check the motor's direction of rotation before reconnecting the coupling.

After reassembly, conduct a test run and inspect the pump for leakage, abnormal vibration, unusual noise, and excessive temperature rise. Where a packing seal is used, adjust the gland gradually to achieve the specified sealing condition without overtightening it.

Stop the pump if abnormal conditions occur and correct the problem before returning the equipment to service.

Tools and Safety Requirements

A magnetic-base dial indicator is required when checking shaft alignment, concentricity, and perpendicularity. Use suitable hand tools and soft-faced mallets to avoid damaging machined surfaces during disassembly.

Wear protective gloves and other appropriate personal protective equipment when handling corrosive liquids, contaminated components, and sharp-edged parts. Keep the electrical supply isolated throughout maintenance and assembly work.

Never work on a pressurized pump or attempt to dismantle components before the pump has been isolated, depressurized, and drained.

Custom Machining for Industrial Equipment Components

In addition to filter press pump components, Hansheng Automation provides drawing-based precision machining for non-standard parts used in a range of industrial and specialized equipment. Our machining services cover components for tobacco and packaging machinery, filling equipment, yacht equipment, and remote-controlled racing cars. We support single-piece and small-batch production according to customer drawings and component requirements.